Company

Astrobotic Technology

USA · named on public Moon flights

Astrobotic is a NASA CLPS lander prime. Peregrine Mission One (2024) failed after a propulsion anomaly before landing. Griffin-1 carries the post-VIPER south-pole cargo path (FLIP-centric) on Falcon Heavy. CS-8 Moon Base packaging adds further Peregrine-class deliveries.) attach to the stack.

Hardware

LunaGrid-Lite tethered surface power demo (Astrobotic)

Rover · NASA STMD Tipping Point / funded Space Act partnership with Astrobotic (~$34.6M public) for a high-voltage power transmission demo on the Moon: a CubeRover unreels ultra-light cable from an Astrobotic lander and receives about 1 kW.

MoonBox

Hardware · Astrobotic's MoonBox carries small personal mementos booked by customers on Griffin-1, aggregated into a single manifest and intended to stay on the surface. · Griffin-1 (Moon Base II)

Jobs

Cargo

Flights

Artemis I2022-11-16 · First integrated Artemis flight test: uncrewed SLS Block 1 + Orion.
Blue Ghost Mission 12025-01-15 · Firefly Blue Ghost Mission 1 (TO19D ~$93.3M): Falcon 9 launch 2025-01-15 · soft landing (upright) Mare Crisium 2025-03-02 · all 10 NASA science/tech payloads operated through a full lunar day (+ hours into night).
Artemis II2026-04-01 · First crewed Artemis flight: SLS + Orion lunar flyby.
IM-3 TrinityNET Q1 2027 · Intuitive Machines IM-3 (CLPS CP-11): Nova-C Trinity, NASA Moon Base III.
Artemis IIINET late 2027 · NASA: Artemis III is a 2027 crewed demonstration in low Earth orbit.
Artemis IVNET early 2028 · NASA: Artemis IV is the first planned crewed south-polar landing, early 2028.
Artemis VNET late 2028 · NASA: Artemis V is the second planned crewed south-polar landing, late 2028, when lunar-base surface work begins.
Blue Ghost Mission 4NET ~2029 · South-pole CLPS with multiple rovers (MoonRanger, CSA path) and instruments.

Sources

This is the public record. Jobs and flights a source named.

Public record letter · Company pack · Email a correction