Company

L3Harris (ARDÉ)

USA · named on public Moon flights

L3Harris (ARDÉ heritage) supplies welded-liner carbon-overwrap helium COPVs used as pressurant vessels on Intuitive Machines Nova-C. Public L3Harris delivery notes place the hardware on the IM-2 path (with IM-1 class heritage). role is tanks_pressure.

Hardware

RS-25

Hardware · Four RS-25 engines on SLS core for Artemis I. · Artemis I

Jobs

Cargo

Flights

Artemis I2022-11-16 · First integrated Artemis flight test: uncrewed SLS Block 1 + Orion.
IM-1 Odysseus2024-02-15 · IM-1 Odysseus (TO2-IM): first commercial soft landing (Feb 2024).
IM-2 Athena2025-02-27 · IM-2 Athena (PRIME-1 path): south polar attempt (Mar 2025).
Artemis II2026-04-01 · First crewed Artemis flight: SLS + Orion lunar flyby.
IM-3 TrinityNET Q1 2027 · Intuitive Machines IM-3 (CLPS CP-11): Nova-C Trinity, NASA Moon Base III.
IM-4NET ~2027 · Six NASA science payloads to Mons Mouton / south polar highlands.
Artemis IIINET late 2027 · NASA: Artemis III is a 2027 crewed demonstration in low Earth orbit.
Artemis IVNET early 2028 · NASA: Artemis IV is the first planned crewed south-polar landing, early 2028.
Artemis VNET late 2028 · NASA: Artemis V is the second planned crewed south-polar landing, late 2028, when lunar-base surface work begins.

Sources

This is the public record. Jobs and flights a source named.

Public record letter · Company pack · Email a correction