Part

SLS solid rocket boosters (Northrop Grumman)

Northrop Grumman builds the five-segment solid rocket boosters for SLS Block 1.

Kirkhill manufactures erosion-resistant rubber insulation applied at critical areas on SLS solid rocket boosters and the launch abort system.

Mission brief

SLS launches Orion with four crew for Artemis V, the second planned crewed lunar landing.

Schematic

The jobs on this page are SLS solid rocket boosters, SLS / LAS erosion-resistant rubber insulation, and SLS booster nozzle precision fasteners. The cargo record is Space Launch System and Space Launch System.

Companies

Flights

Artemis I2022-11-16 · First integrated Artemis flight test: uncrewed SLS Block 1 + Orion.
Artemis II2026-04-01 · First crewed Artemis flight: SLS + Orion lunar flyby.
Artemis IIINET late 2027 · NASA: Artemis III is a 2027 crewed demonstration in low Earth orbit.
Artemis IVNET early 2028 · NASA: Artemis IV is the first planned crewed south-polar landing, early 2028.
Artemis VNET late 2028 · NASA: Artemis V is the second planned crewed south-polar landing, late 2028, when lunar-base surface work begins.

Jobs

Cargo

Sources