Company

SpaceX

USA · named on public Moon flights

SpaceX is the densest dual-role company on this map. Falcon 9 and Falcon Heavy have launched or are under contract for multiple commercial lunar landers (Intuitive Machines, Firefly, ispace, Astrobotic Griffin path, SpaceIL Beresheet, and related CLPS stacks).

Hardware

Starship

Lander · SpaceX Starship is NASA's contracted human landing system and a heavy cargo lander class. · Artemis III

Sites

Starbase, Texas

Boca Chica, Cameron County, Texas

Starship factory and current launch campus.

Gigabay · HDR (Design firm of record (TDLR)) · Lerch Bates (Enclosure, VTA, facade access (client HDR))

Factory office · Southern Steel Engineers (Steel connection and stair design)

Housing and pad support buildings · Alpha Building Corp. (GC on homes and pad support buildings (terminated))

Cape Canaveral, Florida

Cape Canaveral, Brevard County, Florida

Florida Starship campus with a planned 32.4 mile, 16 inch natural gas line that Coastal Connect Services, a SpaceX subsidiary, would run in Brevard County from Florida Gas Transmission to SpaceX for rocket fuel.

Gigabay (Cape Canaveral) · HDR (Client of record on the Lerch Bates scope) · Lerch Bates (Enclosure, VTA, facade access)

Starbase, Louisiana

Pecan Island, Vermilion Parish, Louisiana

Announced 25 Aug 2026 as a Starship launch campus.

Jobs

Cargo

Flights

Beresheet2019-02-22 · SpaceIL / IAI Beresheet, private/national hybrid soft-landing attempt.
IM-1 Odysseus2024-02-15 · IM-1 Odysseus (TO2-IM): first commercial soft landing (Feb 2024).
Blue Ghost Mission 12025-01-15 · Firefly Blue Ghost Mission 1 (TO19D ~$93.3M): Falcon 9 launch 2025-01-15 · soft landing (upright) Mare Crisium 2025-03-02 · all 10 NASA science/tech payloads operated through a full lunar day (+ hours into night).
IM-2 Athena2025-02-27 · IM-2 Athena (PRIME-1 path): south polar attempt (Mar 2025).
Blue Ghost Mission 2NET 2027 · Firefly Blue Ghost Mission 2 (CS-3 ~$112M, charter-bg2): planned far-side dual-stack (Blue Ghost stacked on Elytra Dark + ESA Lunar Pathfinder).
IM-3 TrinityNET Q1 2027 · Intuitive Machines IM-3 (CLPS CP-11): Nova-C Trinity, NASA Moon Base III.
Artemis IIINET late 2027 · NASA: Artemis III is a 2027 crewed demonstration in low Earth orbit.
AYAP-1first half 2027 · AYAP-1 is Türkiye's first lunar spacecraft under the Lunar Research Program (AYAP).
Starship Lunar Cargo (HLS path)NET late 2020s-2030s (HLS path) · SpaceX Starship lunar architecture: NASA HLS crew lander path plus heavy cargo configurations.
Artemis IVNET early 2028 · NASA: Artemis IV is the first planned crewed south-polar landing, early 2028.

Sources

This is the public record. Jobs and flights a source named.

Public record letter · Company pack · Email a correction