Company

Advanced Space

USA · builds for the Moon

Advanced Space operated flown CAPSTONE (2022 Electron→Photon into NRHO. NASA ops ended ~Jun 2026) and is NASA prime for CAPSTONE 02 (NET 2027, LV unpublished). NASA Ames hired Advanced Space on 24 July 2026 as prime, owner, and operator of CAPSTONE 02.

Hardware

Two CAPSTONE 02 spacecraft

Hardware · CAPSTONE 02, the Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment 02, flies two identical spacecraft of about 400 kg (882 lb) each around the Moon in 2027. · CAPSTONE 02

Chemical propulsion

Hardware · Stellar Exploration supplies the chemical propulsion system on both CAPSTONE 02 spacecraft, which performs lunar orbit insertion and then the rendezvous and proximity manoeuvres that bring one spacecraft up to the other. · CAPSTONE 02

Radios

Hardware · Utah State University's Space Dynamics Laboratory supplies the CAPSTONE 02 communications system: the direct-to-Earth link and the crosslink between the two spacecraft. · CAPSTONE 02

Jobs

Cargo

Sources

This is the public record. Jobs and flights a source named.

Public record letter · Company pack · Email a correction