Company

Redwire

USA · named on public Moon flights

Redwire builds space infrastructure hardware for lunar and deep-space stacks. For Gateway PPE, Redwire (DSS heritage) supplies two ROSA wings to Maxar, with July 2025 deployment testing and Q4 2025 delivery to Maxar on the public path. Redwire Space NV also supplies IBDM docking mechanisms for ESA Lunar I-Hab.

Hardware

Redwire cameras + vision nav

Hardware · Redwire supplied the cameras, the vision navigation processor and the floodlights that flew on Blue Ghost Mission 1, giving the lander imagery and vision-based navigation through descent and on the surface. · Blue Ghost Mission 1

Jobs

Cargo

Flights

Blue Ghost Mission 12025-01-15 · Firefly Blue Ghost Mission 1 (TO19D ~$93.3M): Falcon 9 launch 2025-01-15 · soft landing (upright) Mare Crisium 2025-03-02 · all 10 NASA science/tech payloads operated through a full lunar day (+ hours into night).
Blue Ghost Mission 2NET 2027 · Firefly Blue Ghost Mission 2 (CS-3 ~$112M, charter-bg2): planned far-side dual-stack (Blue Ghost stacked on Elytra Dark + ESA Lunar Pathfinder).
IM-3 TrinityNET Q1 2027 · Intuitive Machines IM-3 (CLPS CP-11): Nova-C Trinity, NASA Moon Base III.
Artemis IVNET early 2028 · NASA: Artemis IV is the first planned crewed south-polar landing, early 2028.
Argonaut Mission 1 (ArgoNET)NET ~2030-2031 · ESA Argonaut Lunar Descent Element (LDE) is Europe's cargo lander transport element, primed by Thales Alenia Space Italy with Thales Alenia Space France, Thales Alenia Space UK, OHB System AG, and Nammo Space (UK) (ESA consortium 20 Nov 2025).
Gateway PPE + HALOPaused · Paused Gateway integrated architecture: Maxar Power and Propulsion Element (PPE) with Northrop Grumman HALO habitation.

Sources

This is the public record. Jobs and flights a source named.

Public record letter · Company pack · Email a correction