Flight

Gateway PPE + HALO

Paused · PPE + HALO · paused

ArtemisNASA

Paused Gateway integrated architecture: Maxar Power and Propulsion Element (PPE) with Northrop Grumman HALO habitation.

Paused NRHO station stack (PPE+HALO), planned cislunar logistics hub.

Stack

VehiclePPE + HALO
Launch vehicleFalcon Heavy
SiteNRHO

Themes

Crew wear · Moon specWhat people wear on flights that go to the Moon: surface EVA and launch/entry survival in Orion.
Comms & dataLinks, relays, surface networks, and compute: moving data between Earth, orbit, and the surface.
Tech demosHardware and software proving themselves in the real lunar environment before becoming standard kit.

Companies

Prime

NASAPPE PPU-6000 power processing (Maxar)

Named on this flight

MoogPPE PPU-6000 power processing (Maxar)
MDA SpaceCanadarm3 (MDA · CSA Gateway robotics)

Named suppliers

RedwirePPE ROSA wings (Redwire / DSS)

Jobs

HALO PMAD (Airbus Crisa)

Airbus Crisa in Tres Cantos, Spain, designed, integrated and tested the HALO power management and distribution subsystem for Northrop Grumman, which distributes power from Gateway's PPE to HALO systems and visiting vehicles. · Airbus Defence and Space · Airbus

Hardware

Related flights

Sources

This is the public record. Companies and jobs a source named.

Get the flight file