Theme

Earth prep · AIT & integration

Building and qualifying the stack on Earth: assembly, integration, test, and payload hang before launch.

Astrobotic assembly in Pittsburgh covers Peregrine and Griffin-1. Firefly assembly in Cedar Park covers Blue Ghost. Blue Origin assembly covers Blue Moon MK1 and MK2. SpaceX assembly at Starbase covers the Starship factory and the pads. The Blue Ghost Mission 2 vibration test is at NASA JPL.

Mission brief

The JPL vibration test is booked to Blue Ghost Mission 2. Cargo integration jobs pack customer payload onto the lander. The cargo card on this shelf is NavCube3-mini, booked to Altus-1.

Schematic

Job categories are assembly and test, environmental test, and cargo integration. Environmental test includes the JPL vibration run. Cargo integration includes the Celestis memorial.

Cargo

Jobs

Blue Ghost power / solar

Firefly vertical-integration claim for Blue Ghost power and solar resources supporting payload ops through lunar day.

Gigabay design firm of record (HDR)

HDR is the design firm of record for SpaceX Gigabay at Starbase, Texas on Texas Department of Licensing and Regulation project TABS2025022205.

Gigabay foundations (Thompson Construction)

Thompson Construction Group was awarded foundations for SpaceX Gigabay at Starbase, Brownsville, Texas: about 161,000 square feet of shallow foundations plus site work, grading, earthwork, pile installation and chipping, baseplate grouting, cast-in-place anchors, finished floor slab, and base/fill.

Lunar Cruiser crew system & habitability (JAMSS)

Japan Manned Space Systems (JAMSS) is on contracted work and joint research with Toyota for the JAXA/Toyota pressurized rover (Lunar Cruiser): conceptual design of the crew system and crew accommodations, plus personnel seconded to Toyota.

SLS Centaur V upper stage (ULA)

ULA Centaur V is NASA's sole-source next upper stage for SLS on Artemis IV and Artemis V, replacing the canceled Exploration Upper Stage path.

Vast Satellite 15 kW-class bus

Vast Satellite is a high-power satellite bus line announced 19 May 2026, built on Haven-1 subsystems and Haven Demo flight heritage.

Flights

Beresheet2019-02-22 · SpaceIL / IAI Beresheet, private/national hybrid soft-landing attempt.
Artemis I2022-11-16 · First integrated Artemis flight test: uncrewed SLS Block 1 + Orion.
IM-1 Odysseus2024-02-15 · IM-1 Odysseus (TO2-IM): first commercial soft landing (Feb 2024).
Blue Ghost Mission 12025-01-15 · Firefly Blue Ghost Mission 1 (TO19D ~$93.3M): Falcon 9 launch 2025-01-15 · soft landing (upright) Mare Crisium 2025-03-02 · all 10 NASA science/tech payloads operated through a full lunar day (+ hours into night).
IM-2 Athena2025-02-27 · IM-2 Athena (PRIME-1 path): south polar attempt (Mar 2025).
Artemis II2026-04-01 · First crewed Artemis flight: SLS + Orion lunar flyby.
IM-3 TrinityNET Q1 2027 · Intuitive Machines IM-3 (CLPS CP-11): Nova-C Trinity, NASA Moon Base III.
Blue Ghost Mission 2NET 2027 · Firefly Blue Ghost Mission 2 (CS-3 ~$112M, charter-bg2): planned far-side dual-stack (Blue Ghost stacked on Elytra Dark + ESA Lunar Pathfinder).
CAPSTONE 02NET 2027 · NASA hired Advanced Space on 24 July 2026 to fly two identical 400 kg (882 lb) spacecraft to lunar orbit in 2027.
IM-4NET ~2027 · Six NASA science payloads to Mons Mouton / south polar highlands.
Artemis IIINET late 2027 · NASA: Artemis III is a 2027 crewed demonstration in low Earth orbit.
Altus-1 (IM lunar data relay)NET ~2027 · Intuitive Machines Altus-1 is the company's first lunar data relay satellite under NASA Near Space Network Services (NSN).
Starship Lunar Cargo (HLS path)NET late 2020s-2030s (HLS path) · SpaceX Starship lunar architecture: NASA HLS crew lander path plus heavy cargo configurations.
Artemis IVNET early 2028 · NASA: Artemis IV is the first planned crewed south-polar landing, early 2028.
Artemis VNET late 2028 · NASA: Artemis V is the second planned crewed south-polar landing, late 2028, when lunar-base surface work begins.
Blue Ghost Mission 4NET ~2029 · South-pole CLPS with multiple rovers (MoonRanger, CSA path) and instruments.
ispace Mission 4 polar landerNET 2029 · ispace Japan polar landing, currently scheduled 2029, on the ULTRA lander line (same ULTRA design used on Mission 3).
IM-5 Nova-DNET ~2030 class · First cargo-class Nova-D CLPS.
Argonaut Mission 1 (ArgoNET)NET ~2030-2031 · ESA Argonaut Lunar Descent Element (LDE) is Europe's cargo lander transport element, primed by Thales Alenia Space Italy with Thales Alenia Space France, Thales Alenia Space UK, OHB System AG, and Nammo Space (UK) (ESA consortium 20 Nov 2025).
Gateway PPE + HALOPaused · Paused Gateway integrated architecture: Maxar Power and Propulsion Element (PPE) with Northrop Grumman HALO habitation.